Project Nutrient Mixer Mk. II Part 2

Continuing on with the nutrient mixing system it was time to put the cabinet together that would house the prototype. Lumber was purchased and cut at the local mill and the assembly began. I was able to mount the mixing buckets and overflow containers into the frame at the end.

 

The purchased lumber

 

The initial framing of the back of the cabnet.

 

The initial framing of the back of the cabnet.

 

Both frames put together.

 

Both parts joined and the cabnet box is formed.

 

At this time I had mounted the electrical system from the previous project.

 

Tagging the clean side. Finally had a use for all those stickers.

 

The cabnet with the water equipment added.

 

The cabnet with the water equipment added.